Ok.You are missing something … Google Bronco pizza tracker.
Sponsored
Ok.You are missing something … Google Bronco pizza tracker.
I don't know. All I can find is either pie graphs or Ford production tracker that requires a VIN# which I don't have.You are missing something … Google Bronco pizza tracker.
If you are a soft top without the tow package I honestly don't think your odds are low regardless of your reservation date. It all depends on your dealer allocation now. Similar orders that entered the Ford system in fall 2021 have already been built.My dealer removed the tow package today. I switched to a soft top when I had to re-submit my order for MY22. My odds are low but have improved a tiny bit.
You don't have to concede anything...I'm not. Why are people not getting exactly what they want? These things are $50+k in many cases and if I can't get exactly what I want then I'm not buying it.Guess I better call my dealer and have them take the tow pack off my 2dr. What a joke, no one should have to concede anything when Ford has had their order for over 500 days. Production planning and procurement is my job, and there is no excuse not to have enough trailer hitches with 500+ days to procure them.
I get that but at the same time in my case I really don't need the tow package on mine, so I might drop that if I'm not scheduled by the end of next month.You don't have to concede anything...I'm not. Why are people not getting exactly what they want? These things are $50+k in many cases and if I can't get exactly what I want then I'm not buying it.
I removed the tow package on Saturday 12/4. Later that week I got a build date for 2/7. I don't think it was a coincidence and neither does my dealer.Thinking of doing the same. It's the only other constraint I have control over on my order.
What was your reservation date? 2 door or 4 door? MIC or Soft top?I removed the tow package on Saturday 12/4. Later that week I got a build date for 2/7. I don't think it was a coincidence and neither does my dealer.
Me tooInteresting. I think we knew something was up with so few getting build dates. Ok, I'm cool with that. Sure hope my dealer gets allocations this time around. I'm close.
490 days for me. Buuuuutttt, I ordered a 2 door soooo....I’m sitting at day 442 so I’m not far behind ya…definitely feeling it, especially when people that don’t have reservations get scheduled
Reservation 8/15, ordered 10/15. 4 door soft top OBX with 2.7, LUX, and SAS.What was your reservation date? 2 door or 4 door? MIC or Soft top?
I'm a 2 door and wouldn't concede to a soft top even if I had a choice. I want what I want and will wait for it.My problem is I'm a 2 door. Pretty much screwed in the top department. I see they now have a soft top available but it's $2,500k extra and your still built with the hard top. So won't even help.
I wouldn't either. The only thing I conceded was the tow as we weren't going to tow with it, just for a Hitch Haul basket once in a while so I already bought the Curt receiver.You don't have to concede anything...I'm not. Why are people not getting exactly what they want? These things are $50+k in many cases and if I can't get exactly what I want then I'm not buying it.