1-2 months, depending on if your Bronco goes by train and how far by train. Mine took 3 months from build date to delivery, but because they pulled it back into the factory 2x for repairs before finally loading it on a train.How long is it usually from scheduled for production date to delivery date? (I know that is a question loaded with lots of possible variables)
Sweet! What was your reservation date?Dayum, I am somebody I am somebody! 2 dr Badlands non-Squatch, High pkg, Aux switches, capable bumper, no tow-pkg! w00t!
7/26/2020Sweet! What was your reservation date?
Congrats, Karl. Thanks for the info. I was trying to track how out of luck we October folks are. My conclusion - very much so.7/26/2020
Roller coaster from last week finding out I was PC 2 then the chaos over the weekend making me think I'm screwed and then suddenly getting the build notice.
Congrats, just got email back from Samantha and she had said no HEs were picked up from Granger so you must have be the exception. What number were you in line?Just got back from a trip, but I got my email on Tuesday morning. I couldn't believe it as Monday night I got a call from Granger to go over what my options were due to constraints. They said the needed to know by February 2 so I said let's hold off on a decision yet. The next morning I wake up to a great email. Samantha called as well and said she had 25 orders previewing and mine was the only one that got picked up.
I did call Ford to make sure it wasn't an error and they told me scheduled for production the week of February 27 and delivery week of March 24.
I am number 1Congrats, just got email back from Samantha and she had said no HEs were picked up from Granger so you must have be the exception. What number were you in line?