UPDATE: just got the Bronco back from the dealer after 3 months. Decided to take the Ford incentive to wait for them to repair vs buy it back. Had a loaner car the whole time so not bad. They replaced the transfer motor, small transfer case wiring harness, and then the main wire if harness. This...
Yeah the whole thing is odd. When I brought it in every everyone was in awe of it. Loved the color and I immediately got an automated text from the sales department asking if I want a trade in quote. Figured this was standard and that everyone was genuinely impressed with it.
In the back for my...
Update: They still haven't fixed it. The shop is still waiting for a wiring harness to arrive.
2 options: Ford buys back what I put into it or an incentive to wait until it's fixed. Just waiting for Ford to confirm the amounts for both. Had to give all the documents but it's been 1 week and a...
My ā23 black diamond has been at the shop since 7/11/23 since it wouldnāt shift into 4 wheel drive during a recent trip. Itās been off-road twice before with no issues and has 8,200 miles on the clock. The GOAT lights would just flash then give a power train failure message after a minute of...
Reservation 7/27/20, ordered 10/24/22, build date 11/28/22, shipped 12/24/22. Delivery eta was pushed out 3 times but dealer said itās now in a rail car so thatās hopeful.
The original delivery date was before Christmas. The eta has been pushed out several times at this point. Iām not fixed on the end of the month but itās already been pushed out so should be soon. Weāll seeā¦
7/29/2020 reservation and 10/24/2022 order date. Already built!
Iāve had a 1989 Bronco II since 2002 thatās been great since the 4.0 engine swap but the top comes off this one. So stoked š¤
7/29/2020 reservation and 10/24/2022 order date. The first notification I received was that itās already been built!
Iāve owned a 1989 Bronco II since 2002. Itās been great since the 4.0 engine swap but the top comes off this one. Still keeping the bronco II