Mine shipped on the 17th with Norfolk Southern, but hasn’t moved since the 20th from Flat Rock scanner, KY. Hoping there’s not an issue that will hold it up too long.
Hope my rail car wasn’t involved in this. Got my last update from Norfolk Southern at Flat Rock Scanner, Kentucky line around 1:20pm. Glad only 2 injured.
https://nypost.com/2022/12/20/train-derails-in-tennessee-after-crashing-into-truck-video/amp/
Nothing seems to be consistent other than the inconsistency. I think I just got lucky with chat. The rep provided rail car number without me asking. Others have said that the rail car number will be listed on the updated DORA you can get from the dealer or the dealer should be able to track...
12/2 blend and was put on chip hold. Moved to built 12/11 and moved to shipped 12/17. Was able to get rail car number from chat yesterday also. Do have lux package.
Tracker moved to built this morning! No email yet. Chat told me I was on chip hold on Saturday and dealer confirmed yesterday. Estimated delivery of 12/16.
12/1 blend
12/2 production
12/11 built
Just checked in with chat. They told me that I'm on hold, but they didn't have visibility to what the hold was and I'd need to check with my dealer. Boooo
12/1 build, 12/2 production
12/1 Blend , 12/2 production. Still showing in production on all trackers.
Talked with chat this morning. They said no holds currently on order and still in production. Have dual tops and tow, so maybe it's stuck at MOD facility? Not sure what sends Bronco to MOD line, so seem to be stuck...
Place in line and rotation number. Check out the thread below for a ton of info.
https://www.bronco6g.com/forum/threads/bronco-build-process-guide-window-sticker-blend-date-production-rotation-number-built-shipped-emails-delivery-date-estimates-more.24987/
My tear tag populated today also. Hoping for built status soon.
Anyone know if dual tops has to go to MOD shop? Wondering if dual top option pushes back build time.
12/1 blend, 12/2 production. Mods popped 12/2 but no tear. Hit up chat today and they let me know I was built with estimated delivery of 12/19-12/25. Hasn’t shipped yet or been assigned a rail car number.
No built email yet and still showing in production on all trackers.