No. I also ordered a 2.7, Lux, Sas. After seeing the constraints I don't think I'll get one anytime soon. I do not know the process if it will automatically switch over to a 22 or do I have a chance to cancel since this will probably be a long time.
Are both of these orders Badlands with the smaller engine and non Sasquatch? I'm just trying to confirm what you think doesn't have parts constraints. Sorry, I'm not great at reading the options list/codes.
im wanting a Badlands with the Sasquatch package. I was just going to leave out the hardtop if I thought that would cut the wait time from 18 months to 2-3 months. I figure if I really still wanted one I could lick one up at sometime.
Does this sound correct? I figure most people ordered with hard tops and I know thereās a shortage of hard tops but I didnāt figure I would get one this year ordering so late. Is there anything specifically that I should order or should not order that would get mine built faster?