Sponsored

Search results

  1. Pin hole in cv boot

    Dealer is a couple weeks out. My badlands Sasquatch has king shocks and camburg uppers. With 37/12.5/17 baja boss tires. I believe to be cv grease all over passenger inner tire and components. 4 wheel drive functions all seem to work but 4low seems off and 4a has a hot smell which led me to...
  2. Snow breaches inside of Bronco w/ soft top during blizzard claims owner

    50mph+ Cross wind comes into the bronco above the rear doors. Love everything about the softtop except that. I can’t believe there’s no actual weather stripping or something sealing it.
  3. đź›  9/6/21 Build Week Group

    Took possession with 15 miles on it today and will have 300 miles on it here in a little bit. This thing rocks. Wider more stable wrangler with more power. Wind pushes it around a lot less.. softtop is not that loud actually believe it or not.
  4. đź›  9/6/21 Build Week Group

    Caught it coming in today!
  5. đź›  9/6/21 Build Week Group

    5:30 am today on Saturday I received a shipment notification.
  6. đź›  9/6/21 Build Week Group

    Yes my dealer order guy “which is super old school not the most tech savvy” said mine was actually built last week. His also showed mine was set to be delivered the last week of October. So lots of different information out hard to know what’s right.
  7. đź›  9/6/21 Build Week Group

    That is a lot better then mine..... mine says it will ship in 41 days....................
  8. đź›  9/6/21 Build Week Group

    316/893; Pizza Tracker was just updated. Shows Produced 9/13 and built 9/14.
  9. đź›  9/6/21 Build Week Group

    9/6 build week. 9/9 blend date. Just received this morning at 2:45 am!! Pizza tracker did not update to built though. The different trackers show it was produced 9/13. early morning 7-14 reserve date. Sasquatch badlands high package 333A. Softtop and no tow hitch. I ordered the factory tow...
Top