Got my baby pic. And my rail car status is “hold awaiting placement” which I think means it’s at the rail yard awaiting pickup from dealer. Blend was 9/12.
Finally escaped “awaiting shipment” limbo and got a shipped email last night. ETA window is best week, so I’m thinking it has been shipped for a while but the system just updated the info. Wildtrak 9/12 blend, 9/29 built
* I meant first post on this thread.
The delay could be we are waiting on a part related to tow. But , also, sometimes folks are stuck “in production” and the vehicle suddenly shows up at the dealer.
First post but I thought I’d add to this data. 4 door WT with Tow, blend 9/12, stuck “in production.” Ford chat told me secondary status was “produced” and the system shows an ETA of 10/2-10/8. I know from experience that this could mean it’s been shipped already and the tracker just didn’t...
Were you all mostly planning to drop the fox shocks in alone, or are you adding the heavy duty tie rods etc too? Any insight into the install on the fox shocks is appreciated. I’m too late to add HOSS 3.0 to my wildtrak a and want to know how I can add fox shocks.
I ended up with two Broncos and need to sell one. Badlands, 4 door, 2.7, Sasquatch, tow, HD modular bumper, mid package, soft top, Area 51. I’m asking $72K. About 100 miles. I’ll add more pics later. Just picked this up last night from the dealer. Located in San Bernardino.