Just picked up my 2023 Badlands for issue occurring during the dealer delivering it after accessory installation. The driver barely started out and it went into limp mode. They replaced clutch, flywheel, throw out bearing, and slave cylinder. Slave cylinder failed at 3300 ish miles damaging...
Like the Bronco script and bar design. My CG just needed a little something so added the full kit. Stripe kit makes it more of an attention grabber.
Going to be hard keeping it looking new - about a mile of gravel to get home.
Arrived at dealer this afternoon - missed the phone call from my salesman (John Wick movie afternoon). Evening drive to see in person. Should be able to pickup by the weekend.
At 28 seconds the back side of the wheel shows and looks like the brake rotor. Pretty shiny to be the back side of the wheel. Haven't tried to capture and blow up to see if lug bolts or holes show.
My 2DR BL 7MT was shipped around the 10th via rail. Same blend date as yours. Just roof rack, hoop steps, and optional wheels so fairly simple build. Just checked email and delivery was moved up a week/10 days - next 7 days or so new projected time frame.
Checked in with the dealership today and salesman showed the Bronco sitting on the rail car northeast of Kansas City. Didn't see a rail car number in the header information but may be listed in another screen. Timeline still showed it having an ETA of April 2nd delivery to the dealer. Think...
Ray, yours has a #7 on the windshield and Chris's has a #8. Both pics are HT and Base Squatch. The emblem on the front fenders are Sasquatch which is only on the Base trim since the others have their respective trim badge there.
I have been wondering if at least two shifts are running. All of my emails have time stamps after 2:00 AM. Might be after the production runs are completed from the previous day. Expected the shipped email Monday and it was delivered at 3:49 AM today with EDD of 30 Mar - 5 Apr. (WOO HOO!!)
My blend date 3/7 showed up this morning on the tracker with a built date of 3/8 - no info other than modules active all day yesterday. I have the roof rack and hoop steps so thinking it was delayed for those items. I was #502 in the line for 3/7.
Any one else seeing the March 6th build week date slide right? Checked the "track my order" link in the email a couple times and started the 6th, then the 7th, and as of this morning now the 10th. Probably be moved to the 13th build week at this rate.
Tim and Sarah at Long McArthur Ford have a YouTube video cast at 7 PM on Tuesdays and they give the weeks scheduling and a lot of other Ford information over the 2-2 1/2 hour broadcast. Check into it an hour or so later and can scroll through some of the information if it doesn't apply to your...