I've got a small garage and a ProStreet '65 Mustang along with a '66 Bronco and '22 Bronco. It's amazing how much longer that little Mustang is than the Bronco!
I put the $100 deposit down the 2nd day you could, just because I couldn't get through the first day. So I believe my total wait time was 2 years and 9 days! Now I did switch dealerships once and agree to a '22 instead of a '21, etc during that wait.
Blackcat, I'm a day two reservation holder who got switched to a '22. My dealership is also Stephens so my question is "do I just call John and ask him where I stand on the list of waiting Bronco orders?"
My '22 was supposed to be built end of May, but I'm still waiting on shipping per the dealer. When I go to the "Module tracker" I notice many don't have all 4 lines filled in. So my question is "Do these need all four lines filled in to be completed?"
Mine is scheduled for a 5/30/22 build.
OB, 4 door, SAS, mod bumper, soft top, in Carb Gray
Went from a '21 to a '22, then dropped hardtop, then dropped tow package.
We'll see if it really happens.
I can't get the Ford tracker to work anymore. I used to be able to enter my order # and VIN and it would (at least) show mine was ordered. Now if I enter same info it just reverts back to asking for the info again.
Anyone else having trouble with it?
Thanks guys. And does the "build date" mean date it should be completed? Or date they start on it? I'm assuming it takes 2 or 3 days to be built or am I wrong?