- Joined
- Jan 23, 2021
- Threads
- 1
- Messages
- 22
- Reaction score
- 43
- Location
- Louisville, KY
- Vehicle(s)
- 2018 Jeep Wrangler Unlimited
- Your Bronco Model
- Outer Banks
Build date doesn't mean much. I got my 1st "scheduled for production" email on 4/22 with a 6/10 date.
Got my 2nd email on 5/15 with a 6/21 date.
3rd email on 5/18 with a 6/28 date.
No news until a F engineer looked it up and told me the super duper new date was 8/2.
Now, the tracker shows it has been "In production" since 8/2.
I've been told it's awaiting a new soft top.
Got my 2nd email on 5/15 with a 6/21 date.
3rd email on 5/18 with a 6/28 date.
No news until a F engineer looked it up and told me the super duper new date was 8/2.
Now, the tracker shows it has been "In production" since 8/2.
I've been told it's awaiting a new soft top.
Sponsored