I got an email from ford that my build week was bumped up from 10/11 to 10/4 with my window sticker showing blend date 10/8!

#172/443
let us know what Ford communicates once it is built. We are next week!!!
Sponsored

 

MateriaTattoo

Black Diamond
Well-Known Member
First Name
Nicholas
Joined
Aug 19, 2021
Threads
3
Messages
115
Reaction score
198
Location
Pennsylvania
Vehicle(s)
Subaru Impreza
Your Bronco Model
Black Diamond
Ok, this post is meant to give a thorough understanding of how the build process works and what all these terms mean, for those of you asking. First thing you have to understand, this is not like ordering something off Amazon. There are tools and trackers, but they are often way off on their estimated times, or come in long after the vehicle has actually been built or shipped. Here is a great thread with links to all the various trackers etc.

https://www.bronco6g.com/forum/threads/here-are-the-bronco-build-tracking-links.22795/

First off the window sticker.

1633617466655.png


You should get your window sticker about a week before your "blend" date. Blend is the point where the chassis and body meet on the assembly line to go through final assembly. The work on the body and chassis has already begun a few shifts before this date. My blend above shows "2021/10/14" So my Bronco is scheduled to go down final assembly on 10/14.

1633617679030.png


This shows I am the 496th out of 881 scheduled units to begin the final assembly process on 10/14. FYI, This number is both Bronco and Ranger since they run down the same line.

1633617861032.png


Number next to blend date is the rotation number. This is the main number production workers pay attention to. It is the master sequencing number. 4015 will blend after 4014. 496/881 is a scheduled target, but they may be a bit behind or ahead for the day/week. Rotation number will roll back to 0001 after 9999.


So today is your blend date, now what. You wait! The final assembly process takes more than a shift to complete, lets say 1.5 shifts to get from blend through final QC. If your rotation number comes up on end of first shift or during second shift, you will not be complete until the next day.
Once your build is complete, the Ford system should send you a build email, but its not that simple. Some people get them quick, some are delayed days. If your bronco has to go to the Mod shop for roof rack, body graphics, or safari bar, that will delay your build notification. PPF has to go to an off-site body shop and that will delay as well. If your Bronco is selected for random extra Quality checks is another delay. If quality checks find an issue that needs to be addressed, that could be a lengthy delay. Then there is just the plain fact the Ford system isn't great and some people never get a built email.

While we sit and wait wondering if our Bronco has been built yet, we can check if our "modules have popped". Ford has an online as built service site that shows your PCM and BCE modules. If your VIN starts showing something as the below screenshot, it means your computers are "alive" and your Bronco has been built.

https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/asbuilt

1633618976934.png


Now our Bronco is built, next we wait for shipping. There are two ways units leave MAP, by rail or by convoy (18 wheeler car hauler). Your window sticker will show which way your Bronco leaves.

1633619089846.png


Generally, convoy is within a few states of Michigan, Rail is the rest of the country. Your Bronco can leave the shipping yard quick, or it can sit there a while. It seems lately convey is sitting a bit, there are trucker shortages really hurting the industry. Rail will ship to a regional rail yard, and sit there until there is a convoy full to send to your dealer or region.

Once your Bronco ships you will get another email from Ford notifying you with delivery estimates. These estimates can be way off sometimes, your dealer should be able to tell you how long shipping usually takes to them.

https://www.bronco6g.com/forum/threads/here-are-the-bronco-build-tracking-links.22795/

The above tracker link has links and instructions to tracking your shipment. Seems to be easier to track by convoy. To track Rail you will need your dealer to give you the rail car number your Bronco is sitting in.
This was the most informative piece of info I have read on this forum. Thank you!
 

MateriaTattoo

Black Diamond
Well-Known Member
First Name
Nicholas
Joined
Aug 19, 2021
Threads
3
Messages
115
Reaction score
198
Location
Pennsylvania
Vehicle(s)
Subaru Impreza
Your Bronco Model
Black Diamond
That is amazing news! I have a blend date of today. I hope mine is delivered as quickly as yours :)
Damn that’s a quick delivery. Do you live close the the factory?
 

BroncoRN

Badlands
Active Member
First Name
Summer
Joined
Aug 4, 2020
Threads
0
Messages
36
Reaction score
51
Location
Miami for now but Colorado in 2022!
Vehicle(s)
Land Rover Range Rover & Ford Bronco (Badlands)
Your Bronco Model
Badlands
Clubs
 
Damn that’s a quick delivery. Do you live close the the factory?
No, I live in Florida. I was just being hopeful that mine would arrive within the same time frame. I see "rail" on my sticker, so who knows how long that can take. Sounds like there are a lot of variables that come into play. Just glad I had a blend date of yesterday!
 

BradtheWelder

Base
Well-Known Member
First Name
Brad
Joined
Sep 11, 2020
Threads
11
Messages
154
Reaction score
471
Location
Moline, IL
Vehicle(s)
1969 Ford Bronco
Your Bronco Model
Base
Ohhh yeah finally populated. 10/15 blend date with 641/878 sequence number

Ford Bronco đź›  10/11/21 Build Week Group Snap240
 

Sponsored

Seatmandan

Big Bend
Well-Known Member
First Name
Dan
Joined
Aug 11, 2021
Threads
0
Messages
407
Reaction score
680
Location
Michigan
Vehicle(s)
'21 Bronco, '11 Ford Edge, '10 Ford Fusion Sport
Your Bronco Model
Big Bend
Ok, this post is meant to give a thorough understanding of how the build process works and what all these terms mean, for those of you asking. First thing you have to understand, this is not like ordering something off Amazon. There are tools and trackers, but they are often way off on their estimated times, or come in long after the vehicle has actually been built or shipped. Here is a great thread with links to all the various trackers etc.

https://www.bronco6g.com/forum/threads/here-are-the-bronco-build-tracking-links.22795/

First off the window sticker.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


You should get your window sticker about a week before your "blend" date. Blend is the point where the chassis and body meet on the assembly line to go through final assembly. The work on the body and chassis has already begun a few shifts before this date. My blend above shows "2021/10/14" So my Bronco is scheduled to go down final assembly on 10/14.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


This shows I am the 496th out of 881 scheduled units to begin the final assembly process on 10/14. FYI, This number is both Bronco and Ranger since they run down the same line.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


Number next to blend date is the rotation number. This is the main number production workers pay attention to. It is the master sequencing number. 4015 will blend after 4014. 496/881 is a scheduled target, but they may be a bit behind or ahead for the day/week. Rotation number will roll back to 0001 after 9999.


So today is your blend date, now what. You wait! The final assembly process takes more than a shift to complete, lets say 1.5 shifts to get from blend through final QC. If your rotation number comes up on end of first shift or during second shift, you will not be complete until the next day.
Once your build is complete, the Ford system should send you a build email, but its not that simple. Some people get them quick, some are delayed days. If your bronco has to go to the Mod shop for roof rack, body graphics, or safari bar, that will delay your build notification. PPF has to go to an off-site body shop and that will delay as well. If your Bronco is selected for random extra Quality checks is another delay. If quality checks find an issue that needs to be addressed, that could be a lengthy delay. Then there is just the plain fact the Ford system isn't great and some people never get a built email.

While we sit and wait wondering if our Bronco has been built yet, we can check if our "modules have popped". Ford has an online as built service site that shows your PCM and BCE modules. If your VIN starts showing something as the below screenshot, it means your computers are "alive" and your Bronco has been built.

https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/asbuilt

Ford Bronco đź›  10/11/21 Build Week Group Snap240


Now our Bronco is built, next we wait for shipping. There are two ways units leave MAP, by rail or by convoy (18 wheeler car hauler). Your window sticker will show which way your Bronco leaves.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


Generally, convoy is within a few states of Michigan, Rail is the rest of the country. Your Bronco can leave the shipping yard quick, or it can sit there a while. It seems lately convey is sitting a bit, there are trucker shortages really hurting the industry. Rail will ship to a regional rail yard, and sit there until there is a convoy full to send to your dealer or region.

Once your Bronco ships you will get another email from Ford notifying you with delivery estimates. These estimates can be way off sometimes, your dealer should be able to tell you how long shipping usually takes to them.

https://www.bronco6g.com/forum/threads/here-are-the-bronco-build-tracking-links.22795/

The above tracker link has links and instructions to tracking your shipment. Seems to be easier to track by convoy. To track Rail you will need your dealer to give you the rail car number your Bronco is sitting in.
AWESOME write-up, Ksjrb03- you nailed a TON of things that the Dealers, unfortunately, don't convey to their customers. This information is INVALUABLE. Nice job!
 

Catmandu

Badlands
Well-Known Member
Joined
Jul 27, 2020
Threads
21
Messages
603
Reaction score
2,148
Location
SW Florida
Vehicle(s)
2013 Jeep JKU (Officially Sold), 2015 Expedition
Your Bronco Model
Badlands
Clubs
 
Ok, this post is meant to give a thorough understanding of how the build process works and what all these terms mean, for those of you asking. First thing you have to understand, this is not like ordering something off Amazon. There are tools and trackers, but they are often way off on their estimated times, or come in long after the vehicle has actually been built or shipped. Here is a great thread with links to all the various trackers etc.

https://www.bronco6g.com/forum/threads/here-are-the-bronco-build-tracking-links.22795/

First off the window sticker.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


You should get your window sticker about a week before your "blend" date. Blend is the point where the chassis and body meet on the assembly line to go through final assembly. The work on the body and chassis has already begun a few shifts before this date. My blend above shows "2021/10/14" So my Bronco is scheduled to go down final assembly on 10/14.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


This shows I am the 496th out of 881 scheduled units to begin the final assembly process on 10/14. FYI, This number is both Bronco and Ranger since they run down the same line.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


Number next to blend date is the rotation number. This is the main number production workers pay attention to. It is the master sequencing number. 4015 will blend after 4014. 496/881 is a scheduled target, but they may be a bit behind or ahead for the day/week. Rotation number will roll back to 0001 after 9999.


So today is your blend date, now what. You wait! The final assembly process takes more than a shift to complete, lets say 1.5 shifts to get from blend through final QC. If your rotation number comes up on end of first shift or during second shift, you will not be complete until the next day.
Once your build is complete, the Ford system should send you a build email, but its not that simple. Some people get them quick, some are delayed days. If your bronco has to go to the Mod shop for roof rack, body graphics, or safari bar, that will delay your build notification. PPF has to go to an off-site body shop and that will delay as well. If your Bronco is selected for random extra Quality checks is another delay. If quality checks find an issue that needs to be addressed, that could be a lengthy delay. Then there is just the plain fact the Ford system isn't great and some people never get a built email.

While we sit and wait wondering if our Bronco has been built yet, we can check if our "modules have popped". Ford has an online as built service site that shows your PCM and BCE modules. If your VIN starts showing something as the below screenshot, it means your computers are "alive" and your Bronco has been built.

https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/asbuilt

Ford Bronco đź›  10/11/21 Build Week Group Snap240


Now our Bronco is built, next we wait for shipping. There are two ways units leave MAP, by rail or by convoy (18 wheeler car hauler). Your window sticker will show which way your Bronco leaves.

Ford Bronco đź›  10/11/21 Build Week Group Snap240


Generally, convoy is within a few states of Michigan, Rail is the rest of the country. Your Bronco can leave the shipping yard quick, or it can sit there a while. It seems lately convey is sitting a bit, there are trucker shortages really hurting the industry. Rail will ship to a regional rail yard, and sit there until there is a convoy full to send to your dealer or region.

Once your Bronco ships you will get another email from Ford notifying you with delivery estimates. These estimates can be way off sometimes, your dealer should be able to tell you how long shipping usually takes to them.

https://www.bronco6g.com/forum/threads/here-are-the-bronco-build-tracking-links.22795/

The above tracker link has links and instructions to tracking your shipment. Seems to be easier to track by convoy. To track Rail you will need your dealer to give you the rail car number your Bronco is sitting in.

@Administrator this would make a GREAT sticky note. Thank you @Ksjrb03!
 
Last edited:

Sponsored

atlbrvefn

Black Diamond
Well-Known Member
First Name
Brian
Joined
Jul 20, 2020
Threads
3
Messages
100
Reaction score
204
Location
Florida
Vehicle(s)
Black Diamond Bronco
Your Bronco Model
Black Diamond
Clubs
 
I don't understand how some who are a state over have an extra 2 weeks wait for delivery lol. Thought being in IL would be an advantage!
My dealer said cars have been arriving before the early date in most cases.
 

sfifty1

Badlands
Member
Joined
Jan 22, 2021
Threads
0
Messages
11
Reaction score
20
Location
central illinois
Vehicle(s)
21 rr autobiography sport/21 f150, 20 wrangler/
Your Bronco Model
Badlands
My dealer said cars have been arriving before the early date in most cases.
mine was built 10/6 and has a 10/17 delivery date, but my dealer shows it arriving 10/11 or 12.
 

TripleB

Base
Well-Known Member
Joined
Jul 14, 2020
Threads
28
Messages
1,166
Reaction score
1,787
Location
Georgia
Vehicle(s)
2021 Ford Bronco Base Sas 2.7L, 2023 GMC AT4 HDD
Your Bronco Model
Base
Clubs
 
Good luck to all of you Columbus Day builds.
Sponsored

 
 


Top