I'm thinking that some things are coming up in QC on the lines. I was a 10/18 blend, 10/20 production, 10/25 build, and just got my shipping email this morning.
I'm a 2.7L BaseSquatch with aux switches and floor mats only being shipped by rail to Florida. My ETA is from 11/7 - 11/13.
What was your blend/rotation number? 713/2166 here, rotation 0504
Sponsored