- First Name
- Ted
- Joined
- Jun 5, 2021
- Threads
- 15
- Messages
- 1,191
- Reaction score
- 2,443
- Location
- Henryetta, Ok
- Vehicle(s)
- 69 F100, 56 CJ5, 11 F250, 17 F150
- Your Bronco Model
- Base
- Thread starter
- #196
I just don’t get it I’ve been scheduled since 10/28 and I’ve been pushed all the way to 3/7 . How are they just giving y’all vin’s and putting it ahead of guys that have been scheduled sooo long.Got my email for 2/14 build date today 1/22/22. I was using the back door couple of weeks ago and was scheduled for 2/21 then it got pushed to 2/28 and then to 2/14 (then got email). I hope it doesn't change again. Reservation 7/03/21, ordered 8/05/21, reordered 10/13/21. Had Priority Code 19 the whole time. Base, 2.3 L Manual trans Velocity Blue 2 door MIC top only added floor/cargo mats and Aux Switches. "Base of the Base".
congrats but WTC
Sponsored