Mine is still showing "order confirmed" in the tracker too.If thatās true, then mine should show tomorrow with an 8/5 date. No change in status from order confirmed yet.
Sponsored
Mine is still showing "order confirmed" in the tracker too.If thatās true, then mine should show tomorrow with an 8/5 date. No change in status from order confirmed yet.
What is your rotation number? Iām 3993i have 8/2 build week, originally 7/19. Just checked the window sticker today 7/21 and it finally popped up! Blend date of 8/4, shipped by rail. The Bronco6g tracker says in production now but ford tracker has not updated status yet
I was told yesterday my bronco is in assembly and they sent the moroney/sticker and it was an 8/2 build week. What I donāt know is whether 8/2 is when it is supposed to finish or when it starts. If it starts 8/2 I assume I am ahead of schedule. Or it just says in production but nothing happened. Hard to sayGoing to start out by saying Iāve had my VIN since April. I was scheduled 6/7 and have subsequently been moved many times since. I have a 8/2 build week with a 8/5 build date for my Cyber Orange OBX. I know some that have this week have window stickers already, I do not. Starting this thread for those that have the 8/2 build week to chat and share news.
My order still only shows āorder confirmedā in the order tracker from Ford.
Iām assuming thatās the big number just to the right of the blend date. 4498What is your rotation number? Iām 3993
I wonder if ours will take the same train??Hour 2 reservation. 08/02 build week, 08/03 build date, got sticker 7/20, rail shipment to Florida. Badlands 2dr, 2.3L, 7sp, lux.
Look at your window sticker, the last 4 digits above Blend are the build date and the numbers to the right of that are your rotation number. The CS rep I talked to made it sound like it was actively being built, when in reality āin productionā means all parts have been identified and production has been scheduled.I was told yesterday my bronco is in assembly and they sent the moroney/sticker and it was an 8/2 build week. What I donāt know is whether 8/2 is when it is supposed to finish or when it starts. If it starts 8/2 I assume I am ahead of schedule. Or it just says in production but nothing happened. Hard to say
I am in the same boat... waiting to see... I give it a 10% chance of actually showing up for me this week.I was originally a 6/28 then 7/19 and eventually settled on 8/2, window sticker still not popping for me. Hopefully it will by the end of the day, as It looks like there are a few getting theirs, if not by the end of the week, surely.
I was told I went into production at 11:10 (she was very specific). I had the link to window sticker after that, but was my sticker wasnāt available until the next morning.I am in the same boat... waiting to see... I give it a 10% chance of actually showing up for me this week.
0802 rotation 2970, thanks I did not know where to find that. Appreciate the heads up!Look at your window sticker, the last 4 digits above Blend are the build date and the numbers to the right of that are your rotation number. The CS rep I talked to made it sound like it was actively being built, when in reality āin productionā means all parts have been identified and production has been scheduled.
Why so? With every day that passes your chances only increase.I am in the same boat... waiting to see... I give it a 10% chance of actually showing up for me this week.