I have a BB 4D 2.3 soft Sas with a build date of 8/4. I was a later reservation. The month coming up for scheduling there should be a lot of BB and BL with this build.I currently have a 4dr:
Badlands
Soft top
Sasquatch
2.7
I’m debating on switching to a 2.3 to help offset some costs and to hopefully get it in MY21. I know it’s anyone’s guess, but what does everyone think my chances are if I have a 7/23 reservation? Did someone have a similar build with that late of reservation? I also really don’t wanna give up the squatch…
Sponsored