- Thread starter
- #1
Notes:
• Production Weeks: 6/3 - 6/24.
• Only Scheduling for Raptor, 2-Door Heritage Limited, Everglades and Retail Heritage Standard
No Availability:
- E4G - 4-Door Heritage Limited
Important:
- Raptor Orders will require a mix in the order bank of 50% with Optional Beadlock Wheel (64T) and 50% with standard wheel.
• Production Weeks: 6/3 - 6/24.
• Only Scheduling for Raptor, 2-Door Heritage Limited, Everglades and Retail Heritage Standard
No Availability:
- E4G - 4-Door Heritage Limited
Important:
- Raptor Orders will require a mix in the order bank of 50% with Optional Beadlock Wheel (64T) and 50% with standard wheel.
Sponsored