Sponsored

8/2 (or earlier) and current builds soft top delay?

Headsong

Black Diamond
Well-Known Member
First Name
Jeff
Joined
Aug 23, 2020
Threads
53
Messages
5,402
Reaction score
8,882
Location
Kane County, Western Chicago area
Vehicle(s)
22 Black Diamond non squatch 4 door softtop v6
Your Bronco Model
Black Diamond
Clubs
 

BD Cactus

Black Diamond
Well-Known Member
First Name
Paul
Joined
Apr 22, 2021
Threads
0
Messages
89
Reaction score
115
Location
Florida
Vehicle(s)
BMW
Your Bronco Model
Black Diamond
I have an 8/5 build. Built email a few days later. Got my delivery email 8/11 with estimated delivery between 8/26 and 9/1
 
OP
OP
Ig_bronco

Ig_bronco

Black Diamond
Well-Known Member
First Name
Matthew
Joined
Feb 17, 2021
Threads
37
Messages
671
Reaction score
740
Location
Pittsburgh PA
Vehicle(s)
2014 JKU
Your Bronco Model
Black Diamond
Clubs
 
Not if you're built. We don't know why...
If you're built you got a ship date. Some folks (myself included) have been in production
 

Desert_6G

Badlands
Well-Known Member
First Name
Eric
Joined
Jul 7, 2020
Threads
19
Messages
1,115
Reaction score
2,054
Location
Phoenix, AZ
Vehicle(s)
Ranger
Your Bronco Model
Badlands
Clubs
 
So it's safe to assume most of us are affected by the chip shortage
If the build is checked on the track your good to go. It's passed final inspection, now just waiting on shipping scheduling
 

LAbronco

Base
Well-Known Member
First Name
Jim
Joined
Jul 20, 2021
Threads
0
Messages
102
Reaction score
101
Location
Pineville, LA
Vehicle(s)
1986 Ford Mustang, Bronco Base 4 Door VB
Your Bronco Model
Base
I’m beginning to think it’s a chip shortage also. Excuses and reasons for a base softie to sit in production for 10+ days are slim. I have been hoping they just forgot to change to built and they are waiting on a trailer to ship it. But, that theory fades with every day of no movement. There are too many of us for it to be a glitch.
 

Sponsored

BandofEskimoBrothers

Black Diamond
Well-Known Member
First Name
Jay
Joined
Dec 18, 2020
Threads
4
Messages
257
Reaction score
470
Location
Fort Mill, SC
Vehicle(s)
Bronco
Your Bronco Model
Black Diamond
Clubs
 
If you're built you got a ship date. Some folks (myself included) have been in production
There is some lag. I had an 8/5 blend date. 8/6 build. Tracker just updated this morning with an estimated delivery date of 8/29.

Still no official built e-mail.
 
OP
OP
Ig_bronco

Ig_bronco

Black Diamond
Well-Known Member
First Name
Matthew
Joined
Feb 17, 2021
Threads
37
Messages
671
Reaction score
740
Location
Pittsburgh PA
Vehicle(s)
2014 JKU
Your Bronco Model
Black Diamond
Clubs
 
There is some lag. I had an 8/5 blend date. 8/6 build. Tracker just updated this morning with an estimated delivery date of 8/29.

Still no official built e-mail.
I'm an 8/2 with nothing. Tracker says in production
 

Headsong

Black Diamond
Well-Known Member
First Name
Jeff
Joined
Aug 23, 2020
Threads
53
Messages
5,402
Reaction score
8,882
Location
Kane County, Western Chicago area
Vehicle(s)
22 Black Diamond non squatch 4 door softtop v6
Your Bronco Model
Black Diamond
Clubs
 
I'm an 8/2 with nothing. Tracker says in production
I'm built but not you know? (no notification) I'm not thinking it has anything to do with chips, but we're free to speculate since they won't tell us.

Good morning, my Bronco - less friends.
 

Godot75

Badlands
Active Member
Joined
Aug 7, 2021
Threads
1
Messages
32
Reaction score
108
Location
Connecticut
Vehicle(s)
Bronco, Porsche 911
Your Bronco Model
Badlands
Badlands, 4dr, Manual, non-sas, soft top, mid package. I'm a 7/23 Blend Date with 8/2 as the build date (pushed back twice). I do have a window sticker, but I've been in "In Production" purgatory for weeks.
Sponsored

 
 


Top