- Thread starter
- #1
Is it possible that every ordered 2.3L will be built in MY21 ?
Setting aside the 9-18 break-off and timestamps.
Using the Bronco6g current 2.3L take rate of 24.5%-
60K MY21 production-
114K converted orders ( 60% of 190K will convert- "Ford-about half will get MY22" )
114,000 x 24.5% = 27,930 ( 28,000) 2.3L
So 60,000 MY21:
7,000 FE
28,000 2.3L
25,000 2.7L -non FE
How many of the 25,000 would be Sasquatched ? Only two of the three main suspensions have been broken out-we could use a subset of non-Sasquatched BL.
Setting aside the 9-18 break-off and timestamps.
Using the Bronco6g current 2.3L take rate of 24.5%-
60K MY21 production-
114K converted orders ( 60% of 190K will convert- "Ford-about half will get MY22" )
114,000 x 24.5% = 27,930 ( 28,000) 2.3L
So 60,000 MY21:
7,000 FE
28,000 2.3L
25,000 2.7L -non FE
How many of the 25,000 would be Sasquatched ? Only two of the three main suspensions have been broken out-we could use a subset of non-Sasquatched BL.
Sponsored