4 door right?I ordered 3/7/22 and my ONLY option was the AUX Switches and I have my VIN and a Build Week.... I don't think you need to worry. Get the switches!!!
Sponsored
4 door right?I ordered 3/7/22 and my ONLY option was the AUX Switches and I have my VIN and a Build Week.... I don't think you need to worry. Get the switches!!!
that's right.4 door right?
I'm contemplating deleting the aux switches and I'm wondering if that might speed up my build date.
Anyone?
Thanks!
Don’t remove them…I'm contemplating deleting the aux switches and I'm wondering if that might speed up my build date.
Anyone?
Thanks!
OK you convinced me, avoiding the broken gadget is worth keep the aux switches.The sunglasses holder are junk mine broke within two weeks, I’ve seen others say they have broken theirs. I have one sitting here to replace my broken one if we ever get decent weather. Keep the switches the guy that buys the Bronco after you will thank you.
My base has Aux switches and $295 paint upgrade (was Rapid, now Hot Pepper). I also ordered 6 months before you. Nothing but crickets.They are my only option (2dr base model) and I ordered first week of Oct 2021, still no hint of a build date!
The hold up is most assuredly because the OP ordered a 2-door. The order bank is 28% 2-Door, and Ford has the capacity to build 15-16% as 2-Doors.the hold up is NOT aux switches BUT allocation at your dealership.
I have a lot of life left in my subaru so I guess I'm just going to have to suck it up and wait!My base has Aux switches and $295 paint upgrade (was Rapid, now Hot Pepper). I also ordered 6 months before you. Nothing but crickets.
Main constraint is still the hard top. Ford never got that fixed from a "production" standpoint. So, while they are making tops, they are only making about 50-60% of what is needed for actual demand.
Have heard rumors of the transmission being constrained as well.