So let me start by saying I play Very excited about getting my new Bronco which I just put my reservation in on yesterday. I intentionally waited until I felt I would be ensured a MY with a white roof. Enough about me, let me explain what I did in my infinite boredom. *all math is estimated and rounded
I took the number of reservations and multiplied by the F number of expected orders. Then I looked at the number of Broncos it’s possible to make in a week. But my boredom did not stop there! I then tweaked those numbers to what might be more realistic for both actual orders and actual Broncos made per week. Once I finished that I realized I had spent to much time on math not to share with like minded bored and obsessed people. So because I ordered last these answers are roughly how long it should take to get through all 250,000 reservation. If you have an idea where you are in the mix you should be able to roughly estimate how many weeks you will need to wait. Allow me to share
reservations x % = Y # of orders. Then Y/total estimated builds per week = total weeks to wait.
250k X 70%= 175k.
175k/3500 BPW = 50 weeks. /3200 BPW = 54 weeks
/3400 BPW = 51 weeks. /3100 BPW = 56weeks
/3300 BPW = 53 weeks. /3000 BPW = 58 weeks
250k X 65% = 162.5k
162.5k/3500 BPW = 46wks. /3200 BPW = 51 wks
/3400 BPW = 48wks. /3100 BPW = 52 wks
/3300 BPW = 49wks. /3000 BPW = 54 wks
250k X 60% = 150k
150k/3500 BPW = 43 wks. /3200 BPW = 47 wks
/3400. BPW = 44 wks. /3100 BPW = 48 wks.
/3300 BPW = 45 wks. /3000 BPW = 50 wks
250k X 55% = 137.5k
137.5k/3500 BPW = 39 wks. /3200 BPW = 43 wks
/3400 BPW = 40 wks. /3100 BPW = 44 wks
/3300 BPW = 42 wks. /3000 BPW = 46wks
250k X 50% = 125k
125k/3500 BPW = 36 wks. /3200 BPW = 39 wks
/3400 BPW = 37 wks. /3100 BPW = 40 wks.
/3300 BPW = 38wks. /3000 BPW = 42 wks
hope this helps somebody and once building starts I will know I’m somewhere between 58 weeks and 35 weeks away.
I took the number of reservations and multiplied by the F number of expected orders. Then I looked at the number of Broncos it’s possible to make in a week. But my boredom did not stop there! I then tweaked those numbers to what might be more realistic for both actual orders and actual Broncos made per week. Once I finished that I realized I had spent to much time on math not to share with like minded bored and obsessed people. So because I ordered last these answers are roughly how long it should take to get through all 250,000 reservation. If you have an idea where you are in the mix you should be able to roughly estimate how many weeks you will need to wait. Allow me to share
reservations x % = Y # of orders. Then Y/total estimated builds per week = total weeks to wait.
250k X 70%= 175k.
175k/3500 BPW = 50 weeks. /3200 BPW = 54 weeks
/3400 BPW = 51 weeks. /3100 BPW = 56weeks
/3300 BPW = 53 weeks. /3000 BPW = 58 weeks
250k X 65% = 162.5k
162.5k/3500 BPW = 46wks. /3200 BPW = 51 wks
/3400 BPW = 48wks. /3100 BPW = 52 wks
/3300 BPW = 49wks. /3000 BPW = 54 wks
250k X 60% = 150k
150k/3500 BPW = 43 wks. /3200 BPW = 47 wks
/3400. BPW = 44 wks. /3100 BPW = 48 wks.
/3300 BPW = 45 wks. /3000 BPW = 50 wks
250k X 55% = 137.5k
137.5k/3500 BPW = 39 wks. /3200 BPW = 43 wks
/3400 BPW = 40 wks. /3100 BPW = 44 wks
/3300 BPW = 42 wks. /3000 BPW = 46wks
250k X 50% = 125k
125k/3500 BPW = 36 wks. /3200 BPW = 39 wks
/3400 BPW = 37 wks. /3100 BPW = 40 wks.
/3300 BPW = 38wks. /3000 BPW = 42 wks
hope this helps somebody and once building starts I will know I’m somewhere between 58 weeks and 35 weeks away.