- Thread starter
- #1
Hi All,
I have been reading on here a few different places about how dealer stock with lower trims/no constrained commodities are getting built to fill gaps in scheduling at the factory before reservation holders. Not really thinking this should be the way it works due to all the reservation holders out there waiting patiently, but if they are just going to fill dealer stock orders anyway with ADMs... I am one of the fortunate few 7/13 reservation holders who supposedly has their truck coming soon, so I canceled my 2nd reservation a while back, but now my brother is pretty interested in a basic Bronco, so just wondering;
Only thing he really wants is the manual transmission, prefers the 2 door but not married to it. Does anyone "in the know" out there think if he orders something like a no-option base 2Dr or Big bend 4 door w/Soft top or something along those lines he'd be able to get his order converted and built in the next 3-6 months or so?
Thanks for any input
I have been reading on here a few different places about how dealer stock with lower trims/no constrained commodities are getting built to fill gaps in scheduling at the factory before reservation holders. Not really thinking this should be the way it works due to all the reservation holders out there waiting patiently, but if they are just going to fill dealer stock orders anyway with ADMs... I am one of the fortunate few 7/13 reservation holders who supposedly has their truck coming soon, so I canceled my 2nd reservation a while back, but now my brother is pretty interested in a basic Bronco, so just wondering;
Only thing he really wants is the manual transmission, prefers the 2 door but not married to it. Does anyone "in the know" out there think if he orders something like a no-option base 2Dr or Big bend 4 door w/Soft top or something along those lines he'd be able to get his order converted and built in the next 3-6 months or so?
Thanks for any input
Sponsored