- First Name
- John
- Joined
- Jan 14, 2017
- Threads
- 66
- Messages
- 2,012
- Reaction score
- 3,511
- Location
- North Central WI
- Vehicle(s)
- A bunch.
- Your Bronco Model
- Big Bend
The only ecoboost I have experience with is the 3.5 in my expedition. I like it. In fact it drives much better than the 5.7 wedgie in my 2500.
In the end I went with the 2.3 and alas a slush box since I couldn’t get the options I wanted with the preferred row it yourself. But the Bronco will replace my old JK as my DD so I am very comfortable with my choice.
In the end I went with the 2.3 and alas a slush box since I couldn’t get the options I wanted with the preferred row it yourself. But the Bronco will replace my old JK as my DD so I am very comfortable with my choice.
Sponsored