- Thread starter
- #1
the Expect 50% of normal levels at start up...still that 50% more than 2 days ago“Renesas president Hidetoshi Shibata previously said that production at the plant would resume within a month, but a recovery to pre-fire levels would take up to 120 days. Shibata is due to hold a press conference on Monday to update the status of the plant.”
But it’s 50% less than a month ago.the Expect 50% of normal levels at start up...still that 50% more than 2 days ago
Thought this fire happened a month or 2 ago?Well shit, first a shortage, then a fire. I ain't never gettin' my new Bronco.
Could have brother, but it is the first I have heard of it. Hopefully we are past this.Thought this fire happened a month or 2 ago?
All Auto manufacturers are having the problems. I drive by dealerships and their new lots are nearly empty.Could have brother, but it is the first I have heard of it. Hopefully we are past this.
that has no relevance anymore , whats important now is the upward trend . and that is a 50% increase in production and looking at 100% in a couple more monthsBut it’s 50% less than a month ago.
i know we couldn’t possibly have a fire here could we?If we would produce our own shit this wouldn't be as much of an issue.