- Thread starter
- #1
I have a FE order, now a priority 10 code and thinking to convert back to priority 99. I have not been scheduled for production at this point, does anyone know if I'm able to convert back to 99? Sorry if this has been discussed, I did not see this very topic covered. Thanks.
Sponsored