- Thread starter
- #1
After waiting months for our Mach-E to arrive after the build date (4m), my Badlands, Sasquatch, 4 door, hard top, Eruption Green, arrived just 2 weeks after the build. It was built 1/7 and arrived on 1/21. Overall I waited a year and a half. The original deposit was placed on July 14, 2020.
Sponsored