I am attributing this to the first editions and WT eating up the parts based on reservation time. Once they get through the first month or 2 of building and more of the standard equipment saq are built more parts will be available to diversify the build schedule and adhere more to the timestamps. I'd veiw this as a positive, a large volume dealer got a decent build report for the first month of deliveries including one model with saq optioned on a lower trim. They could of used those parts twords another WT or FE but they used them on someone else's lower tier build probably based on timestamp and other part availability. In essence they are doing the best they can to get them built and honor the convuluted system and shortages they backed themselves into. I don't expect to see my bronco until fall based on demand and parts and I won't be upset about the wait until December or January. If you thought you'd get yours first because you ordered day 1 or got a FE then idk what to tell you really, 20,000 other people think the same thing.