- Thread starter
- #1
Just in- MAP will be down the week of 7/5 to allow commodity supplies to catch back up.
One week closure, production resumes 7/12 with full speed production still on track for 8/2.
EDIT 2: The 2nd week of shutdown - 7/26 - is now confirmed as well.
This leaves three remaining weeks of ramp-up phase production (6/28, 7/12, and 7/19) before full line speed production begins on 8/2.
One week closure, production resumes 7/12 with full speed production still on track for 8/2.
EDIT 2: The 2nd week of shutdown - 7/26 - is now confirmed as well.
This leaves three remaining weeks of ramp-up phase production (6/28, 7/12, and 7/19) before full line speed production begins on 8/2.
Sponsored
Last edited: