- Thread starter
- #1
No email but window sticker loaded this morning. Moved from 10/4 build week to 9/27 blend date. What a surprise!!!!
Sponsored
It was adding the tow package back that moved you forward. lol, I said before (with ZERO evidence, I might add) that they were building them all with tow and the tow deletes went to the end of the line.No email but window sticker loaded this morning. Moved from 10/4 build week to 9/27 blend date. What a surprise!!!!
No doubt it was adding back the tow pckg. . I honestly believe there are no more constraints except the MIC... Ford even said if you want your Bronco faster to move to soft top; no mention of any other constraints like previously.It was adding the tow package back that moved you forward. lol, I said before (with ZERO evidence, I might add) that they were building them all with tow and the tow deletes went to the end of the line.
You might have your rig by Thanksgiving
I don’t think there are any other ones…they are building as many per day as they have soft tops available, and they have surplus capacity for everything else. If you’re a soft top, there’s generally nothing more you can do to get built.No doubt it was adding back the tow pckg. . I honestly believe there are no more constraints except the MIC... Ford even said if you want your Bronco faster to move to soft top; no mention of any other constraints like previously.