- Thread starter
- #1
Ordered my 2D base in Oct 2021, still don't have a vin for whatever reason. Any guesses on when I'll finally get my rig?
Sponsored
Yup.Holy crap - I haven't been around much on the forum in the last several months.. There are still people waiting from the original preorder group?
Hmmmm that’s strange, I have a 2D Sasquatched Base I ordered in Oct 2021 and have a vin and build week of Oct 10. I ordered the 2D Sasquatch’d base after picking up my 4D Sasquatch’d Base the first week of October of 2021. The 4 door was so impressive that first few days I just had to order a 2 door as well.Ordered my 2D base in Oct 2021, still don't have a vin for whatever reason. Any guesses on when I'll finally get my rig?
Here's too much information about what determines when you're getting your bronco (if you feel like torturing yourself ):Ordered my 2D base in Oct 2021, still don't have a vin for whatever reason. Any guesses on when I'll finally get my rig?
This is the correct answerHere's too much information about what determines when you're getting your bronco (if you feel like torturing yourself ):
1. Dealer allocations: How many Broncos your dealer is getting and where you stand in line is by far the most important factor. If you happen to put in an order at a dealer that only had a few orders but extra allocations, your bronco will be built soon assuming they have the parts. Unfortunately, you can't tell the allocations or what number you are unless you ask your dealer and they tell you.
2. Parts constraints: There are lots of lists of things that will push your bronco back in line (i.e. Lux package, MIC top, tow package, Sasquatch, 2.7, etc). The list is mostly chips constraints but there are plenty of parts that have too many people that want them and not enough materials or not enough time to make them. Your 2dr base shouldn't be too hard to make though.
3. Reservation/Order Date: After all that, your reservation or order date will come into play tying in with where you land on dealer allocations.
I'm an October 2020 order for a 2.7L Badlands Sasquatch with Tow, High Package, Mod Bumper, Keyless entry. I'm scheduled for build week of Sept, 26th, but there are people who have simpler builds than me and reservations before me that haven't been built because their dealership has more orders and not enough allocated from Ford.
Soooo yeah. That's a very long answer to say that no one has any idea. Good Luck!
Don't come at us with those preschool numbers! Child's play!Ordered my 2D base in Oct 2021, still don't have a vin for whatever reason. Any guesses on when I'll finally get my rig?
A great list, but I have to add 1) Incompetent dealers who have screwed up your order any number of ways, and 2) Un-scrupulous dealers who have sold your order to someone else.Here's too much information about what determines when you're getting your bronco (if you feel like torturing yourself ):
1. Dealer allocations: How many Broncos your dealer is getting and where you stand in line is by far the most important factor. If you happen to put in an order at a dealer that only had a few orders but extra allocations, your bronco will be built soon assuming they have the parts. Unfortunately, you can't tell the allocations or what number you are unless you ask your dealer and they tell you.
2. Parts constraints: There are lots of lists of things that will push your bronco back in line (i.e. Lux package, MIC top, tow package, Sasquatch, 2.7, etc). The list is mostly chips constraints but there are plenty of parts that have too many people that want them and not enough materials or not enough time to make them. Your 2dr base shouldn't be too hard to make though.
3. Reservation/Order Date: After all that, your reservation or order date will come into play tying in with where you land on dealer allocations.
I'm an October 2020 order for a 2.7L Badlands Sasquatch with Tow, High Package, Mod Bumper, Keyless entry. I'm scheduled for build week of Sept, 26th, but there are people who have simpler builds than me and reservations before me that haven't been built because their dealership has more orders and not enough allocated from Ford.
Soooo yeah. That's a very long answer to say that no one has any idea. Good Luck!
Or the grapefruit.Don't come at us with those preschool numbers! Child's play!
Late June 2020 here and you want some pitty??????
I bet you don't even know about the chair throwing or pineapple pizza from B6g!!!!!!!
This weekOrdered my 2D base in Oct 2021, still don't have a vin for whatever reason. Any guesses on when I'll finally get my rig?
I reserved/ordered my 2D Base in April of 21. It's built, but still on a choo choo train somewhere. That's 18 months. So... 10 -4 = 6...Ordered my 2D base in Oct 2021, still don't have a vin for whatever reason. Any guesses on when I'll finally get my rig?
Oh yeah, the ole one two punch right there.A great list, but I have to add 1) Incompetent dealers who have screwed up your order any number of ways, and 2) Un-scrupulous dealers who have sold your order to someone else.