People without any of these are trying to get information on what to do so this thread is for everyone not in that situation.
A week ago (6/21) I checked the order tracker here and had a window sticker and the Ford Order Tracker showed “in production” but no window sticker. A day later Ford showed it too by me checking but I didn’t receive an email. Blend date is “6/28”
My original reservation was day 1.
2 Dr Outbanks, 2.7, Sasquatch, modular front bumper, aux switches, high package w/ tow.
After missing several weeks of production emails going out I removed Tow package based on comments on this blog and got an email the very next round of a 7/26 production date.
Today, finally got an email telling me my production week has moved to 6/28. Sticker says “Rail” and I’m in Austin TX so im prepared fir late July or early August based on what some people said it took to get an F-150 via Rail. (4 1/2 weeks).
Looks like a lot of 2 drs that had already gotten a production date are getting pulled in and 4 drs are getting pushed out. Guessing they’re knocking out 2 doors before factory shut down and then will focus on 4 drs soft and hard tops. Toughest spot to be seems 2 dr without a production date currently.
Any other 2 drs with a production date get pulled in. Any 4 drs pushed out?
A week ago (6/21) I checked the order tracker here and had a window sticker and the Ford Order Tracker showed “in production” but no window sticker. A day later Ford showed it too by me checking but I didn’t receive an email. Blend date is “6/28”
My original reservation was day 1.
2 Dr Outbanks, 2.7, Sasquatch, modular front bumper, aux switches, high package w/ tow.
After missing several weeks of production emails going out I removed Tow package based on comments on this blog and got an email the very next round of a 7/26 production date.
Today, finally got an email telling me my production week has moved to 6/28. Sticker says “Rail” and I’m in Austin TX so im prepared fir late July or early August based on what some people said it took to get an F-150 via Rail. (4 1/2 weeks).
Looks like a lot of 2 drs that had already gotten a production date are getting pulled in and 4 drs are getting pushed out. Guessing they’re knocking out 2 doors before factory shut down and then will focus on 4 drs soft and hard tops. Toughest spot to be seems 2 dr without a production date currently.
Any other 2 drs with a production date get pulled in. Any 4 drs pushed out?