Originally I was told I was #12(I think) Did you get their priority build?I'm very curious about how long it will take via rail from Detroit to Seattle but I guess only time will tell now.
5/27 I got the "in production" email.
I heard nothing for almost three weeks. Every time I checked it just said in production. I started hearing about folks getting their "built" emails this morning (7/18) so I figured I would check just one more time. To my surprise the Ford tracker showed built at 8am on a Sunday. Two minutes later I received the Ford email.
Before this happened I did reach out to Mikala to try to get an update. She emailed me back this morning to let me know that Bowen Scarf's demo unit and my Badlands should be arriving the same day. As of now their saying Aug 16 - Aug 20.
Have you asked them were you're at in the allocation list?
Mikala also told me someone with a late reservation had gotten a june build date by ordering soft top. Thatās what tipped the scales to completely change my order. I decided to go Basquatch, 2.7 4 door soft top from 2 door Badlands Sasquatch 2.7 lux. I have another Bronco w 99 priority code that Iāll order the way I want for my22
Sponsored