I didnāt change anything on my order of a 4 door Wildtrak cuz I know Iād regret not getting exactly what I wanted if I did change it due to constraintsI originally ordered the 2 door WT but with all the damn constraints I changed my order to a 4 door softie BL...
I still
Secretly love the WT the best...
I am from the Philadelphia area - Delco.For the people that are from PA, anyone from the eastern PA?
Close, Iām from Montgomery county. Trying to see who else got an order through the same dealerI am from the Philadelphia area - Delco.
Monroe countyClose, Iām from Montgomery county. Trying to see who else got an order through the same dealer
Haha me too but with my reservation date (late August)and with the MIC top I was looking at 2022 for my WT delivery. So yes I will always long for the WT a bit but Iām gonna have a blast this fall in my BL!!I originally ordered the 2 door WT but with all the damn constraints I changed my order to a 4 door softie BL...
I still
Secretly love the WT the best...
Close, Iām from Montgomery county. Trying to see who else got an order through the same dealer
[/QUOTE
Good luck. Hopefully we will both get our rigs soon.
Thanks for the info man! Oh man a half built bronco gives me some half hope! HahaHaha me too but with my reservation date (late August)and with the MIC top I was looking at 2022 for my WT delivery. So yes I will always long for the WT a bit but Iām gonna have a blast this fall in my BL!!
If you are soft top I think weāll be getting built emails on Aug 3. Our rides are half built on the floor Iām pretty sure. Theyāll finish them first shift on the 2nd and if you donāt have many or any accessories itāll ship next day (especially if truck and not rail ship). Some wishful thinking, probably, but all the facts point that way!
I originally was in the Badlands camp up until May 13, then I switched to a WT because I wanted that interior, I also saw an FE and realized I really like the black accents and the body colored door handles better (and knew I could put on some quick disconnects) and luckily got scheduled the next cycle on 5/27. Canāt wait!I originally ordered the 2 door WT but with all the damn constraints I changed my order to a 4 door softie BL...
I still
Secretly love the WT the best...
7E0-165-52 But it also error out on https://help.ford.com/update-sync/ Message: "An error occurred. Please try again." So, the sync data on this demo, and I just want to throw this info. out there. | 5B77 |
For what itās worth Iām in the exact same situation and donāt have rock rails.So I guess I can assume my vehicle is not been 100% built or I havenāt got the built email yet because my badlands has rock rails. My dealer said that his system still shows that the vehicle is produced but with no ETA. Whatever that means.
so if it is rock rails even though the assembly line is closed will they still put the rails on and send my built email?
So I guess I can assume my vehicle is not been 100% built or I havenāt got the built email yet because my badlands has rock rails. My dealer said that his system still shows that the vehicle is produced but with no ETA. Whatever that means.
so if it is rock rails even though the assembly line is closed will they still put the rails on and send my built email?
Right across the bridge from PhillyFor the people that are from PA, anyone from the eastern PA?