My 2026 Bronco Badlands finally arrived at my local dealer, today is prep day and installing the tow package, tomorrow I sign the paperwork and start my Bronco adventures. I have some items in the garage waiting to be installed. Will post pictures tomorrow
When I grew up it was the throttle, the clutch, and brake. and sometimes the throttle was the the steering wheel column and was a lever you pushed or pulled.
I don't wear endorsements for tobacco, beer, cars, whiskey. You pay good money for a hat or T-shirt with a logo advertising their product seems kind of back asswards .
I ordered my Badlands February 18, 26 within a week I had and acknowledgment , in April a production with a Production date the week of May 4th- the 9th Build on May 12th. Shipping date was between May 23 and May 29th. up date shipping May 29th- June 9th. From some accounts this seems to be...
I ordered mine, a 2 door manual trans 2/18/26 waiting for the shipping date, anytime between 5/23 -5/29. once I received the confirmation it was ordered I signed up for up dates once the Vin was posted it was fun to check on it once a week. I wish I could have watch it roll down the line.
thanks for the replies, strips are a good plan, thinking a strip about 3 inches wide in line with the steering wheel then one along the fender line front to back . have not picked a color yet. Like everyone else I want mine to stand out.