Thought it might be good for others pending their "Scheduled" message, "In Production" status and/or Window Sticker to know the timing I experienced.
I received my "Scheduled for Production the Week of 9/6" message on 8/19. Yesterday (8/30) I saw that the link in the email took me to an "In Production" page for the first time (rather than the initial " Order Confirmed" status), but no window sticker was available yet. Today (8/31) my window sticker populated with a 9/8 Blend Date, eight days before the Blend Date. Not sure if the 9/6 holiday had any impact on the timing.
For those not familiar, the Blend Date (when the pieces are all assembled into a Bronco) is in the top, white margin of the window sticker, above the word BLEND (20210908 in my case). The date has a 3 prepended to it. Thought I saw that the 3 is the group that the build is in, but not certain. Can anyone confirm?
Your mileage may vary!
Anyone else have timing to share for those currently on pins and needles??
I received my "Scheduled for Production the Week of 9/6" message on 8/19. Yesterday (8/30) I saw that the link in the email took me to an "In Production" page for the first time (rather than the initial " Order Confirmed" status), but no window sticker was available yet. Today (8/31) my window sticker populated with a 9/8 Blend Date, eight days before the Blend Date. Not sure if the 9/6 holiday had any impact on the timing.
For those not familiar, the Blend Date (when the pieces are all assembled into a Bronco) is in the top, white margin of the window sticker, above the word BLEND (20210908 in my case). The date has a 3 prepended to it. Thought I saw that the 3 is the group that the build is in, but not certain. Can anyone confirm?
Your mileage may vary!
Anyone else have timing to share for those currently on pins and needles??