- Thread starter
- #1
Scheduled week 1/1/24 and dealer checked and got a build date of 1/2/24
4dr Wildtrak
Cactus gray
High/lux pkg
Hard top
Tube doors
4dr Wildtrak
Cactus gray
High/lux pkg
Hard top
Tube doors
Sponsored
Contact Ford chat or your dealer for help, for some reason no one got an email from ford. Luckily my dealer has kept me in the loop and gave me the VIN right away and when the blend date was available they gave me that also.Hi Guys,
I placed my order in Sept of this year and have not gotten one single email from Ford. I don't have an order date, VIN, etc.. Is there anyway that I can track the status of my build other than calling the dealership?
I did forget that we did get the initial order confirmation email.I only received an initial email from Ford that my order was accepted. That email had a four digit code that was my order number. There was also another number on the sales sheet I got from the dealer at the time I placed the order. They use those two items to look up my order and provide me with my Vin. Good luck to you.
Ordered November 1. Scheduled December 1 went into production December 15. Window sticker is showing a build/blend date of January 2. order sequence number is 0450.
Badlands four-door non-sas, Lux, MIC with Tow, leather seats and carpet.
ordered 10/31 I haven't heard a word from Ford yet
Outer Banks, 4 dr. Hard top, sasquatch pkg, aux switches
I did get on Ford chat and they told me to call marketing and ask themHave you check with Ford Chat or your dealer?
Your production date is your blend date, they Start production now, and they put it all together on your blend date when it goes down the assembly line.Hello,
‘24 Badlands Non-SAS, 4dr, EG, 2.7, MIC.
Ordered 10/31
Scheduled 1/1/24
Production 1/5/24
Have a VIN. No emails just Ford Chat. No blend date or window sticker.