I've been watching 13 Broncos at my dealership all with January blend dates. 9 have have been delivered. Mine is currently sitting in rail yard purgatory at its final destination, an Outer Banks with a 1/22 blend didn't ship until 2/5. Then there's a Black Diamond with a 1/18 blend and a Heritage with a 1/23 blend both stuck in production purgatory. You're definitely not the only one, I'm curious though what's causing these delays when parts no longer seem to be an issue and demand isn't crazy right nowIs anyone still in production hell? I am my blend date was 1/24 and date under production is 1/25. One very similar to mine at another dealer in my town who had the same dates shipped 2 days ago