My Badlands SAS, LUX, MT is exactly in the same status. Dealer told me on Monday that it was built 02/23/2023 and is now sitting in a lot at the factory in Michigan awaiting a rail car.I have the same problem. Blend date was 2/24. Was suppose to be here last week. Stills shows in production. Dealer says gps shows in Michigan.
Sponsored