- Thread starter
- #1
My order was scheduled to the week of 3/21, and blended 3/26. I’ve been in production ever since. Have gone from a secondary status of “produced” (two weeks ago) to “micro chip hold” (last Friday). Currently have an ETA of May 13 (just like many others) but I don’t expect it to hold. From browsing the other build week threads, it seems a decent percentage of builds each week are being siphoned off into microchip holds as the line rolls on.
Has anyone who has been put on microchip hold recently (in the last two months or so) actually seen their vehicle actually be built? Are these vehicles steadily being finished and trickling out, or are we all just being added to a growing pool of 99% finished Broncos?
Has anyone who has been put on microchip hold recently (in the last two months or so) actually seen their vehicle actually be built? Are these vehicles steadily being finished and trickling out, or are we all just being added to a growing pool of 99% finished Broncos?
Sponsored