Sponsored

Decoding the Vehicle Status Code

JTom

Big Bend
Active Member
First Name
Jana
Joined
Dec 22, 2021
Threads
0
Messages
43
Reaction score
142
Location
Illinois
Vehicle(s)
2022 Bronco Big Bend Area 51!!
Your Bronco Model
Big Bend
Clubs
 
Mine says BWKA
Sponsored

 

donkeygoatrunner

Wildtrak
Well-Known Member
First Name
jason
Joined
Apr 15, 2021
Threads
5
Messages
114
Reaction score
250
Location
UT
Vehicle(s)
2014 FJ Cruiser TTUE
Your Bronco Model
Wildtrak
Clubs
 
Thanks for posting this.
I was GRTA last night; VITR when I checked this morning. Blend date of 12/23, built Jan 5. Estimated delivery on pizza tracker of 1/22; backdoor tracker shows 1/23-1/29.
 

M&M Beer

Outer Banks
Well-Known Member
First Name
Marty
Joined
Jan 1, 2021
Threads
54
Messages
952
Reaction score
1,251
Location
Michigan
Vehicle(s)
Ford Edge-F-150 Supercrew
Your Bronco Model
Outer Banks
Mine says SFnW
 

Sponsored

Kameronatm

Badlands
Well-Known Member
First Name
Kameron
Joined
Jul 29, 2021
Threads
26
Messages
680
Reaction score
882
Location
Texas
Vehicle(s)
Bronco Badlands 4dr
Your Bronco Model
Badlands
Clubs
 
BWKA

My guess: "Build Week assigned?"

I am currently showing a build week of 1/24 (after showing a 1/31 week for about 48 hours last weekend). I am originally scheduled for 1/24.
Mine updated today from BWKA to OSEQ. I am hoping this means progress.

UPDATE* I was told that it went into "production" status on 1/9. Which looks to mean that once you have a Build Date then you are locked in as in Production.
 
Last edited:

Kameronatm

Badlands
Well-Known Member
First Name
Kameron
Joined
Jul 29, 2021
Threads
26
Messages
680
Reaction score
882
Location
Texas
Vehicle(s)
Bronco Badlands 4dr
Your Bronco Model
Badlands
Clubs
 
UPDATE 1/19:
Here is my Hypothesis:

BWKA: Build Week has been Assigned Confirmed with my experience
OSEQ: Order in Sequence (blend date assigned or about to be assigned) Confirmed with my experience
STRT: Inside your Build Week, pre-production, 7 days out w/ window sticker Confirmed with my experience
PROD: On the production Line
GRTA:Getting Ready to Activate or QC
VITR: Vehicle in Transit by Rail
 
Last edited:

Kameronatm

Badlands
Well-Known Member
First Name
Kameron
Joined
Jul 29, 2021
Threads
26
Messages
680
Reaction score
882
Location
Texas
Vehicle(s)
Bronco Badlands 4dr
Your Bronco Model
Badlands
Clubs
 
Mine updated today from BWKA to OSEQ. I am hoping this means progress.
I believe this is correct, today I found out my build date has been assigned as Jan 28th.
 

TXRancher

Badlands
Well-Known Member
Joined
Feb 12, 2020
Threads
4
Messages
269
Reaction score
563
Location
Brownwood TX
Vehicle(s)
2011 F150
Your Bronco Model
Badlands
Clubs
 
Still STRT when it was supposed to be built today. Also, why can't Ford put up the window stickers?
 

Panmort

Outer Banks
Well-Known Member
Joined
Jul 6, 2020
Threads
3
Messages
1,173
Reaction score
3,205
Location
Texas
Vehicle(s)
22 Outer Banks Bronco
Your Bronco Model
Outer Banks
Clubs
 
Update to my status that was STRT previously. The pizza tracker updated to in production, and the backdoor is still the same scheduled for production. But, checking the code again it's updated to PROD. So it does appear things are happening in the background.
 

Sponsored

Jazer

Outer Banks
Well-Known Member
First Name
Jessica
Joined
Jun 20, 2021
Threads
9
Messages
2,320
Reaction score
6,447
Location
NC
Vehicle(s)
2.7 OBX
Your Bronco Model
Outer Banks
Clubs
 
GRTA now. Was built yesterday and I just got my back door delivery date estimation.
 

dpav02

Badlands
Well-Known Member
First Name
Dave
Joined
Jul 5, 2020
Threads
3
Messages
205
Reaction score
392
Location
Pittsburgh
Vehicle(s)
2006 Toyota 4Runner Sport
Your Bronco Model
Badlands
Clubs
 
Thank you for the tips! My code is PROD still, which is has been since December 24.
I was also supposed to be the week of 12/20/2021 for my 2022 Badlands.

I just ran this script and mine still says PROD. My tracker says the build date is 12/23/2021 and down below, it says, "estimated delivery date: 1/15/2022" but that's clearly not happening.

My tracker only shows "in production" without a build date or anything, which matches this status code.

And, I think I checked, my modules did "pop", so I have no idea what's going on.

Oh and I still cannot view my window sticker.
 

Big Diamond

Wildtrak
Well-Known Member
First Name
Miles
Joined
Jul 1, 2021
Threads
12
Messages
802
Reaction score
1,704
Location
Atlanta, GA
Vehicle(s)
2022 Bronco HOSS 3.0 Wildtrak
Your Bronco Model
Wildtrak
Clubs
 
Great thread. Thank you, OP!

I'm OSEQ so I have hopes that I won't get bumped from og build week of 1/17.
Progress!
 

Msitayem

Black Diamond
Well-Known Member
First Name
Moe
Joined
Dec 6, 2021
Threads
0
Messages
297
Reaction score
753
Location
Charlotte, NC
Vehicle(s)
2000 Chevy Corvette
Your Bronco Model
Black Diamond
Clubs
 
I was also supposed to be the week of 12/20/2021 for my 2022 Badlands.

I just ran this script and mine still says PROD. My tracker says the build date is 12/23/2021 and down below, it says, "estimated delivery date: 1/15/2022" but that's clearly not happening.

My tracker only shows "in production" without a build date or anything, which matches this status code.

And, I think I checked, my modules did "pop", so I have no idea what's going on.

Oh and I still cannot view my window sticker.
I am in the same boat as you :(
 

_jt

Base
Well-Known Member
Joined
Jan 10, 2022
Threads
0
Messages
57
Reaction score
116
Location
WI
Vehicle(s)
1996 Mazda Miata
Your Bronco Model
Base
BWKA
1/31
Sponsored

 
 


Top