Sponsored

How to Change Order?

Steve 91

Big Bend
Member
First Name
Steve
Joined
Jul 25, 2021
Threads
3
Messages
10
Reaction score
2
Location
New Jersey
Vehicle(s)
2012 Nissan Armada
Your Bronco Model
Big Bend
I have a 4-door Big Bend, 2.7, Mid package on order (Oct 2021). I am thinking of changing my order to a 2.3 Manual (better mpg plus I prefer driving a stick), and Standard Pkg (fewer chips). How would I make this change--contact the dealer? Does it impact my place in line? Any downsides (besides possible price change since October, but it will still be thousands cheaper than my original build)?
Sponsored

 

El Bronco Blanco

Wildtrak
Well-Known Member
First Name
Matt
Joined
Sep 29, 2020
Threads
3
Messages
480
Reaction score
662
Location
Scottsdale, AZ
Vehicle(s)
2013 Ford Explorer XLT, 2021 Mazda CX-9
Your Bronco Model
Wildtrak
Clubs
 
If you change from MID package to STND package, you will get hit with the recent MY22.5 price hike, unless you have the OG price protection from a reservation as far as I know.

Changing is as simple as emailing/calling your salesman.
 

Destroyer

Badlands
Well-Known Member
Joined
Feb 9, 2021
Threads
0
Messages
249
Reaction score
781
Location
Virginia
Vehicle(s)
2002 Chevy SWB NBS, 2022 Bronco
Your Bronco Model
Badlands
Clubs
 
I have a 4-door Big Bend, 2.7, Mid package on order (Oct 2021). I am thinking of changing my order to a 2.3 Manual (better mpg plus I prefer driving a stick), and Standard Pkg (fewer chips). How would I make this change--contact the dealer? Does it impact my place in line? Any downsides (besides possible price change since October, but it will still be thousands cheaper than my original build)?
Just contact your dealer with the changes you want and they should be able to get it changed for you. No impact to place in line. Switching to a 2.3 will probably help your case to getting one earlier as well as the 2.7 is more of a constraint commodity wise then the 2.3 is.
 
OP
OP
Steve 91

Steve 91

Big Bend
Member
First Name
Steve
Joined
Jul 25, 2021
Threads
3
Messages
10
Reaction score
2
Location
New Jersey
Vehicle(s)
2012 Nissan Armada
Your Bronco Model
Big Bend
If you change from MID package to STND package, you will get hit with the recent MY22.5 price hike, unless you have the OG price protection from a reservation as far as I know.

Changing is as simple as emailing/calling your salesman.
Thanks
 
OP
OP
Steve 91

Steve 91

Big Bend
Member
First Name
Steve
Joined
Jul 25, 2021
Threads
3
Messages
10
Reaction score
2
Location
New Jersey
Vehicle(s)
2012 Nissan Armada
Your Bronco Model
Big Bend
Just contact your dealer with the changes you want and they should be able to get it changed for you. No impact to place in line. Switching to a 2.3 will probably help your case to getting one earlier as well as the 2.7 is more of a constraint commodity wise then the 2.3 is.
Thanks.
 

Sponsored

sniffHound

Well-Known Member
First Name
W
Joined
Oct 31, 2021
Threads
66
Messages
1,387
Reaction score
2,152
Location
Mississippi
Vehicle(s)
Ford Bronco
Your Bronco Model
Undecided
Clubs
 
You are changing from my build. Thanks for the help. :cool:
 

Snake Plissken

Banned
Base
Banned
Banned
First Name
Scott
Joined
Mar 21, 2022
Threads
0
Messages
5
Reaction score
4
Location
Dallas
Vehicle(s)
2022 Maverick
Your Bronco Model
Base
I hope you have price protection.
 

CMillBronco

Black Diamond
Well-Known Member
First Name
Craig
Joined
Oct 26, 2021
Threads
37
Messages
879
Reaction score
914
Location
Colorado
Vehicle(s)
2024 GMC HD 3500 AT4, 2022 Toyota Tacoma TRDORP, 2023 4Runner TRDORP
Your Bronco Model
Black Diamond
No price protection for Oct orders, I ordered 10/25 and just changed my order as well. Went through the price protection too and it doesn't matter if you change or not you have to pay more $$$$.
 
OP
OP
Steve 91

Steve 91

Big Bend
Member
First Name
Steve
Joined
Jul 25, 2021
Threads
3
Messages
10
Reaction score
2
Location
New Jersey
Vehicle(s)
2012 Nissan Armada
Your Bronco Model
Big Bend
No price protection for Oct orders, I ordered 10/25 and just changed my order as well. Went through the price protection too and it doesn't matter if you change or not you have to pay more $$$$.
Bummer
Sponsored

 
 





Top