I have a 2371 rotation and I was figuring a late night Friday build alsoOnly seen a couple numbers after mine. Late Friday afternoon build it looks like....
Sponsored
I have a 2371 rotation and I was figuring a late night Friday build alsoOnly seen a couple numbers after mine. Late Friday afternoon build it looks like....
Nice! 7/19 builds getting started!Just checked again and thereās now a date added to sync updates. So my build was at least touched today
It will be built on Wednesday. Youāre #296 for that day. The averaging 800 or so (Bronco and Rangers per day). Unless something goes off the rails you should be built Wednesday. Go back an ]d reread this thread and you can get an idea how to check on it later on Wednesday.
This is what mine says. Not sure why it shows in that weird color here, the actual window sticker looks like everyone else's. I'm assuming this means my blend date is 07/21 and the 0296 is what number build I am on that particular day? But you guys are posting high numbers with 07/19 blend dates. Does that mean mine won't be built until alllllll of the previous blend dates are built? I can't imagine they're on track, considering how many they're putting out per day vs. the numbers listed on the window sticker. Anyone have any insight as to when I can expect it to start being built?
It will be built on Wednesday. Youāre #296 for that day. The averaging 800 or so (Bronco and Rangers per day). Unless something goes off the rails you should be built Wednesday. Go back an ]d reread this thread and you can get an idea how to check on it later on Wednesday.
Sync now shows updated...You and @Benzo520 are at the top of the list. He hasn't seen anything yet either. I think they're finally catching up to 7/16 builds, so it shouldn't (hopefully) be too much longer for your build.
I wish you the best of luck! My build week was last week, as well as many others I have been stuck in production since last Monday on 07/12.Reservation 7/13/20 8:05PM EST
Order 2/2/21
Original build week 7/26/21 provided May 27th
Updated last Friday to 7/19/21
Called the hotline was told Build Day of 7/21/21
Fingers crossed!
I donāt want to be the bearer of bad news, but this isnāt accurate based on whatās been shared. The rotation number is a continuous count that resets at 9999 (or 8999, as I think no oneās posted any in the 9000s) and all the ones before yours will probably hit the line before yours gets started. Iām 7/16 blend and 7147 rotation and only got my initial updates last night, so it seems theyāre a full day behind. 7/21 blend and 0296 rotation may not hit the line till mid Thursday or early Friday and Iād be prepared for the possibility it is not completed before the shutdown unless thereās a Saturday shift. This is all just a guess, but itās based on all the info in the 7/14, 7/15 and 7/16 blend date threads.It will be built on Wednesday. Youāre #296 for that day. The averaging 800 or so (Bronco and Rangers per day). Unless something goes off the rails you should be built Wednesday. Go back an ]d reread this thread and you can get an idea how to check on it later on Wednesday.
I donāt want to be the bearer of bad news, but this isnāt accurate based on whatās been shared. The rotation number is a continuous count that resets at 9999 (or 8999, as I think no oneās posted any in the 9000s) and all the ones before yours will probably hit the line before yours gets started. Iām 7/16 blend and 7147 rotation and only got my initial updates last night, so it seems theyāre a full day behind. 7/21 blend and 0296 rotation may not hit the line till mid Thursday or early Friday and Iād be prepared for the possibility it is not completed before the shutdown unless thereās a Saturday shift. This is all just a guess, but itās based on all the info in the 7/14, 7/15 and 7/16 blend date threads.