click on the link or go hereHow do I edit it?
https://docs.google.com/spreadsheets/d/1om-su_97T2gWqNU7w8FuXk2OiObunWbGAzHB9EQlxmo/edit?usp=sharing
Update: fixed permissions so you can edit it.
Sponsored
click on the link or go hereHow do I edit it?
https://docs.google.com/spreadsheets/d/1om-su_97T2gWqNU7w8FuXk2OiObunWbGAzHB9EQlxmo/edit?usp=sharing
Cool deal, thank ya. I added mineclick on the link or go herehttps://docs.google.com/spreadsheets/d/1om-su_97T2gWqNU7w8FuXk2OiObunWbGAzHB9EQlxmo/edit?usp=sharing
Update: fixed permissions so you can edit it.
Correction: WS shows up in 6G tracker, 11/10 build dateI’m a 11/8 and my tracker says in production but no window sticker
The rotation numbers roll over after 9999@BroncoBen is your rotation number right?
Makes sense.. didnt think we'd have 2500 builds between the 4th and the 5th..The rotation numbers roll over after 9999
Added mine, Nice job and thanks for doing thatclick on the link or go herehttps://docs.google.com/spreadsheets/d/1om-su_97T2gWqNU7w8FuXk2OiObunWbGAzHB9EQlxmo/edit?usp=sharing
Update: fixed permissions so you can edit it.
Mine says 286/2257 and 8112, I'm not sure which one means what either.I'm still not certain I understand what all of these numbers mean exactly
Click on the "this?" and it will take you there.How do I edit it?
286/2257 is the number in which your vehicle will be built out of TOTAL vehicles on your blend date, not just Broncos, i.e., Rangers + Broncos at MAP. 8112 is just the rotation number for the given week.Mine says 286/2257 and 8112, I'm not sure which one means what either.