I did! Shipping confirmation this morning! Woohoo!Freaking Sweet!!!! Maybe I'll see my "shipped" email tomorrow?? Wonder if @MatchingPonytails received her shipped email too??
Sponsored
I did! Shipping confirmation this morning! Woohoo!Freaking Sweet!!!! Maybe I'll see my "shipped" email tomorrow?? Wonder if @MatchingPonytails received her shipped email too??
Yes! I wasn't able to order one because I had to switch to a soft top in order to get my damn Bronco this year!anyone have delays with the roof rack?
so I know things have/are changing with no rhyme or reason but I have a 7/29/21 reservation and just got a vin and build date in January for a MIC hard top. my slight concern is that after i got the vin I had my dealer add a few accessories like the roof rack. Apparently it will only let you add items that are not in low supply after the vin has been assigned. Hoping that is correct.Yes! I wasn't able to order one because I had to switch to a soft top in order to get my damn Bronco this year!
Your build config can’t be changed at all after the VIN is generated I believe. Your dealer is probably ordering a roof rack for them to install upon arrival, not adding it to your factory order.so I know things have/are changing with no rhyme or reason but I have a 7/29/21 reservation and just got a vin and build date in January for a MIC hard top. my slight concern is that after i got the vin I had my dealer add a few accessories like the roof rack. Apparently it will only let you add items that are not in low supply after the vin has been assigned. Hoping that is correct.
awesome news!Your build config can’t be changed at all after the VIN is generated I believe. Your dealer is probably ordering a roof rack for them to install upon arrival, not adding it to your factory order.
FWIW I was a January 2021 reservation and my 11/24 blend is just finishing up now soft top 2.3L no-tow is the special sauce it seems.
Some aspects of an order can be changed. You can't e.g. add squatch or switch BL to WT. But you can change paint, change seats (e.g. leather to MGV, which I did), and presumably add a roof rack if it's a config allowed by the build tool. If the build tool can't do it, then you can't either.Your build config can’t be changed at all after the VIN is generated I believe. Your dealer is probably ordering a roof rack for them to install upon arrival, not adding it to your factory order.
FWIW I was a January 2021 reservation and my 11/24 blend is just finishing up now soft top 2.3L no-tow is the special sauce it seems.
ETA start and ETA end refer to the range of expected delivery days to your dealership, I believe -- the data is used to drive the shipped emails that come out laterJust updated with production date 12/01 and ETA end date 12/26….. what does the 12/26 date mean?
I got built email the next day (11/30) and shipped email two days later (12/2). I spoke to the dealership today and they said it shipped 12/1 and the norm has been 3 weeks from MAP to their lot. He also gave me the rail car info! I'm literally a kid at Christmas LOLFreaking Sweet!!!! Maybe I'll see my "shipped" email tomorrow?? Wonder if @MatchingPonytails received her shipped email too??
@bkyle Your mods just popped!I just looked at spreadsheet and last 11/24 module pop was 720, I am 829 patiently unpatienly waiting.
This is now officially the longest day in history and I need a new F5 on my keyboard.
Your mods just popped!
DANG! They started popping early today! Outstanding!845/880 has popped!! I’d like to thank the academy, my sales manager, and my invincible F5 button