Me please .. me please . Pick me!!
Sponsored
UGH, well let's hold on tight my friend cause it seems like we will be the last people standing.None of the built/released folks seem to be in that chip hold range of scheduled 4/5-4/6 (I'm almost tired of saying this but since I get called out every time....actually produced late 4/7-4/8).
I've noted that as the number of Broncos In Production goes down, the average time is going way up. 62 days past scheduled build.
Congrats to those that ARE getting released!
This is going to be us..UGH, well let's hold on tight my friend cause it seems like we will be the last people standing.
I’m with you. No movement on mine. Orig blend 4/5 actual 4/7. I’m still in productionNone of the built/released folks seem to be in that chip hold range of scheduled 4/5-4/6 (I'm almost tired of saying this but since I get called out every time....actually produced late 4/7-4/8).
I've noted that as the number of Broncos In Production goes down, the average time is going way up. 62 days past scheduled build.
Congrats to those that ARE getting released!
I am mildly optimistic that the end of July date they initially gave (before moving the entire group of chip hold Broncos to 6/12-6/18) is slightly more realistic. Much like last time, I expect if I check next week, I'll get some random date 8 weeks out, which then the following week will shift to within the next 3 weeks. Thus, "your status of In Production to change" date will be something like August 12th. Then it'll change to July 10. Rinse, repeat.So the ford chat says that the next projected update will be 6/18. Different than when they say it's expected to be delivered on 6/18.
I take that as the next projected disappointed is expected on 6/18.
Honestly, I am happy for everyone getting theirs. I just really want mine.i see a handful of people in the 5/30 group getting built and shipped emails...It's so criminal
it's like waiting in line for a roller coaster for over 2 hours and people with flash pass just skip ahead of everyone.. I am happy for them though!Honestly, I am happy for everyone getting theirs. I just really want mine.
And I will say it again, if you haven’t signed up for the Roadeo, do it! So. Much. Fun!
That's a perfect explanation.it's like waiting in line for a roller coaster for over 2 hours and people with flash pass just skip ahead of everyone.. I am happy for them though!
Thank you Dani, I have been to Six flags in Jersey many times to experience this!That's a perfect explanation.
None of the built/released folks seem to be in that chip hold range of scheduled 4/5-4/6 (I'm almost tired of saying this but since I get called out every time....actually produced late 4/7-4/8).
I've noted that as the number of Broncos In Production goes down, the average time is going way up. 62 days past scheduled build.
Congrats to those that ARE getting released!