I just dont understand why its so difficult for them to verify it for me and make the change if needed. Yeah my build date is 7/28 and I did watch a youtube video stating the constraints for the middle of July?Not difficult at all from their side, but to what @glashaus mentioned, it may take a few days for that change to reflect on the order tracker if they already correct it in their order system. With that said, I do not know if switching from the shadow black top to the paint match will cause your production date to slide, since the painted top is already under constraint from the last report I saw.