No one really knows. I would guess an old MIC top would be installed and moved outside until they get a new one.Help me out here. I have 2 door FE with a 9/8 blend date. If it gets built next week what happens when it gets to the end of the line? Does it get a roof? Is it moved to an outdoor storage lot with a tarp thrown over it (hopefully) till the new roofs are made? Why build the FEs now if there won’t be MIC roofs ready till the end of September/ October?
Posted on the "9/6 Build Week Group" as well.
Sponsored