- Thread starter
- #16
I actually went with the 2.7You are much better off if you want it quicker to keep it a softie. I’m assuming 2.3 since you didn’t state it which helps as well. Also, no tow I assume as well? As long as your dealer has open allocations, 4 - 6 months may not be that big of a stretch assuming Omicron doesn’t step in and piss on Fords parade. Dealer allocations and build constraints are the biggest issue. At one time, reservation date stamp was supposed to set the order of build but that has taken a back seat to allocations.
no tow package, I’ll get an aftermarket hitch welded on. I’ll be towing a small off-road road trailer with it, so I want the bigger engine.
I got the confirmation email, but no order number is contained in it. Does it come later?
Sponsored