- Thread starter
- #1
So excited. I just got a call from my local dealer. I have a Vin number and my bronco is scheduled to go to the plant on January 9. Their estimating it getting to the dealer in North Carolina by the end of February..
Sponsored
Interesting, that's hopefully correct. Mine is scheduled for week 1 in January, with an unknown delivery time frame. Seems, it's hard to knock down actual shipping time after being built.So excited. I just got a call from my local dealer. I have a Vin number and my bronco is scheduled to go to the plant on January 9. Their estimating it getting to the dealer in North Carolina by the end of February..
Some of the build threads for December (last of the '23s) are showing as quick as a month from build to expected arrival....but that of course assumes the shipping estimates are correct. And that particular example was going to NC....Interesting, that's hopefully correct. Mine is scheduled for week 1 in January, with an unknown delivery time frame. Seems, it's hard to knock down actual shipping time after being built.
Ah, I'm in Michigan. So, it'll be interesting how long it takes.There’s a lot of luck that goes with shipping! Most trains make it across the country in three weeks or less but then you need to get trucked from the rail yard to your dealer. That can take a few days to a few weeks.
Best case is you are going by convoy and normally less than a week once you get loaded on a truck. Those are only states basically surrounding Michigan.
We’ve seen people in Michigan get them in less than a week. Somewhat the luck of the draw and timing.Ah, I'm in Michigan. So, it'll be interesting how long it takes.
Maybe better now, but my 23 BADLANDS, non SAS, High, 2.7L sat on a lot in Dearborn for 12 weeks after being built. (Built 23 Mar, delivered 19 July).Interesting, that's hopefully correct. Mine is scheduled for week 1 in January, with an unknown delivery time frame. Seems, it's hard to knock down actual shipping time after being built.
First it needs to get on a rail car after it is built and released, that can take 2 days to several weeks if you are one of the unlucky few that get held up.How long does it usually take from Michigan to Houston Texas on deliveries?
That's great to hear man, that's a pretty quick turn around. I ordered mine here in NC back in March/April 2023 and my original build week was Sept 18th before the strikes which then pushed it to the week of Nov 13th. Got my built notice on Nov 17th and then found out the railcar made it to Winston-Salem on Dec 11th. So hopefully it'll be at my dealer here in the next week or so.So excited. I just got a call from my local dealer. I have a Vin number and my bronco is scheduled to go to the plant on January 9. Their estimating it getting to the dealer in North Carolina by the end of February..
About right, my 2023 was built Nov 17th and is expected to get here this week. So about a month from built to arriving. To be honest, it might've been here sooner but when I was tracing the railcar there was about a 4 day delay in Ohio as it was getting serviced. But after those services it made it down to NC in about 3 days.Some of the build threads for December (last of the '23s) are showing as quick as a month from build to expected arrival....but that of course assumes the shipping estimates are correct. And that particular example was going to NC....