Built 11/29. Have had 4 revised delivery windows with the current dates at the end of January. If that holds it will be about 3 months from being built to being delivered. Ygh!
Sponsored
Put it through the paces in 4x4 asap, mine was built that same week; the front differential failed after the first real use of 4x4...i hope it is not a bad batch from Eaton/Dana. it would not "freewheel" the front end after going to windrock and traveling some moderate trails.Mine was blended 12/21. Tracker had in production. The following week it changed to built, a week later shipped, now im Just waiting for delivery 1/21-1/27.
I’d say in production to delivery at least a month with no hold ups. I’m east coast also, so rail for me.
Where’s the Phoenix rail yard? I thought it was supposed to be a shorter wait if your dealer is close to the yard, because the truckers get paid the same and like short routes.8 weeks, including 3 weeks sitting at the rail yard in phoenix 5 miles from my dealership.
The Phoenix Rail yard is just northwest of downtown Phoenix. Basically where I-10 meets I-17.Where’s the Phoenix rail yard? I thought it was supposed to be a shorter wait if your dealer is close to the yard, because the truckers get paid the same and like short routes.
im also in SC (near Savannah). Curious where you’re located. Mine shipped 7/12 so hoping it’ll show this week!Mine took 4-5 days on rail to get to SC, then sat about a week until a truck could bring it the dealer 80 miles away.
It was shipped within 24 hours of being built.
I was lucky.