The blend date is the day the chassis meets the body on the line. It then goes to final production I think
It’s all very confusing. Blend date, scheduled build date, built date lol easy to get lost
It’s all very confusing. Blend date, scheduled build date, built date lol easy to get lost
Sponsored
Last edited: